Skip to main content

Martec Technologies

Storms bring power outages, surges and flooding, and controls equipment is often the hardest part to replace quickly.

Before the season

  • Make current, tested off-site backups of every PLC, HMI and SCADA project
  • List your critical spares and order any that are missing
  • Test the UPS on control power and confirm SCADA alarms for power loss
  • Write down the safe shutdown and restart order for each line or station

When a storm is coming

  • Shut down in order, following your procedure
  • Protect enclosures in flood-prone areas where you can
  • Confirm remote SCADA access and alarm call-outs for pump stations

After the storm

  • Have qualified staff inspect for water and corrosion before power is restored
  • Check program integrity and reload from backup if needed
  • Bring systems back in your documented order, and log any faults

Plan it now

A preventive maintenance plan with 24/7 support means your controls contractor already has your backups and documents when the power comes back.


Need PLC or SCADA help in South Florida? Call (786) 383-3829 or email info@gomartec.com. Martec serves Miami-Dade, Broward and Palm Beach. See our industrial automation and PLC services.

All articles · Start a project →